Thursday, June 3, 2010

Framing the floors

It's been a couple of weeks since the last posting; but much has been done. Floors have been framed, plumbing run to the 2 bathrooms and the duct work for the HVAC has
been ran.


Anchor bolts that are set into the foundation walls and tied into the rebar



More anchor bolts



Sub-Floor Framing


Sub-Floor Framing


Hanging the furnace/fan


Location of new stairs going to basement


More framing shots. Black pipes are the vent pipes for the bathrooms





Shot from the back of the house