It's been a couple of weeks since the last posting; but much has been done. Floors have been framed, plumbing run to the 2 bathrooms and the duct work for the HVAC has
been ran.
Anchor bolts that are set into the foundation walls and tied into the rebar
More anchor bolts
Sub-Floor Framing
Sub-Floor Framing
Hanging the furnace/fan
Location of new stairs going to basement
More framing shots. Black pipes are the vent pipes for the bathrooms
Shot from the back of the house